 |
|
Electricity, Waterworks and Telephone System
|
| This type of work is normally included in our highway and road projects which are usually huge in size and budget. The complicated construction techniques are required in such projects; namely, the waterworks tunnel in highway no. 37 (Bangbuatong - Bangkhuntien / section 3) owned by Metropolitan Waterwork Authority. This project included water pipe tunnel (dia. 3,000 mm.). | |
| | |
|
|
|
Name of Contract |
: |
Ram indra - At Narong Expressway System(9W) |
|
Location |
: |
Ram indra km. 6 |
|
Owner |
: |
Metropolitan Waterwork Authority | |
| | |
|
 |